Profile
Your identity, mine details and app preferences
Operations
Run and record today's mine activities
Engineering Tools
Fast field calculations and planning tools
Safety & Compliance
Keep inspections and operational safety visible
Records & Reports
Review, export and share mine information
Production Trend (last 7 diary entries)
Sales Trend (last 7 sales entries)
Mine Calculators
Bench Height Calculator
Stripping Ratio Calculator
⚠️ Both values must use the same basis — either both in m³ (bank cubic metres) or both in tonnes. Mixing units gives a meaningless ratio.
Haul Road Gradient Calculator
DGMS regulations typically cap haul road gradients around 1 in 16 (about 6.25%) for heavy vehicles — check your applicable standard.
Powder Factor Calculator
Rock Blasted Calculator
Rock Blasted = Holes × Burden × Spacing × Density × Hole Height
🚛 Haulage Productivity Suite
Dumper payload, cycle time, and fleet/daily production estimators.
Dumper Payload Calculator
Dumper Cycle Time Calculator
Production per Hour
Auto-fills from Payload & Cycle Time calculators above once calculated.
Fleet Production Calculator
Daily Production Calculator
📐 Unit Converter
Convert between volume and weight using material density.
Volume ⇄ Weight Converter
Typical densities: overburden/soil ≈ 1.6–1.9 t/m³, sandstone ≈ 2.2–2.6 t/m³, limestone ≈ 2.5–2.7 t/m³, iron ore ≈ 3.0–4.5 t/m³.
DGMS Inspection Companion
Daily Checklist
Log Accident / Near-Miss
Accident / Near-Miss Log
Mine Diary
Add Today's Entry
Recent Entries
Development Work
Plan • Record • TrackNew Development Entry
Development Progress
Development Log
Development Summary
Sales
Dispatch LogAdd Sales Entry
Recent Sales
Equipment Management
⚠️ Service Alerts
No equipment added yet.
Add Equipment
⛽ Vehicle Diesel Consumption
Accurate consumption uses: Opening Tank + Diesel Refilled − Closing Tank. L/h is calculated from the hour-meter difference. If there are multiple refills during the shift, enter their total litres.
Recent Diesel Logs
No diesel usage logged yet.
Equipment List
Drill & Blast Assistant
Burden & Spacing Estimator
Uses a simplified rule-of-thumb (Burden ≈ 25–30× hole diameter × rock factor). Verify against your actual blast design standards before field use.
Charge & Stemming Estimator
Uses rule-of-thumb: Stemming ≈ 0.7 × Burden; Linear Charge (kg/m) = 0.785 × (dia in m)² × SG × 1000. Verify against your certified blast design before field use.
Rock Blasted Calculator
Rock Blasted = Holes × Burden × Spacing × Density × Hole Height
Explosive Record
Explosive Record Log
Reports
PDF + ExcelEach report is generated instantly from the data you've already entered in the app. Choose PDF for a shareable document, or Excel for a structured workbook you can analyze further. Once downloaded, share the file the same way you'd share any file — email, WhatsApp, or upload.
Profile
🏢 Company Information
This information will automatically appear on every generated report.
📍 Mine Location
Used to fetch local weather on the Dashboard. Enter your quarry/mine's coordinates.
🔐 Account & Privacy
Review MineIQ's privacy information or request deletion of your account and associated data.